We built external power networks for the Ridi Polska in Natolin near Łódź project.
Scope of work
- Construction of the cable line 15kV 3x XUHAKXS 1x120mm²
- Installation of the transformer station 1x 630kVA
- Lighting the area with a length of 480m with YKY 5x25mm² cables with 6m steel poles
- Main contractor
- STRABAG
- Location
- Warszawa
- Main contractor
- WARBUD
- Location
- Warszawa
- Project period
- 2010–2011
- Main contractor
- MIRBUD
- Location
- Warszawa
We built external power networks for the OWT Stryków Salon and Mercedes Service in Stryków project.
Scope of work
- LV cable lines in the area with a length pf 5440m and lighting the area made on 12m poles in the amount of 55 poles and 24 m lighting masts in the amount of 24pcs.
- Project period
- 2005–2006
- Location
- Poznań
We delivered the electrical installations for the Paper mill for MALTADECOR S.A. in Poznań project.